Rotation Of Work Coordinate - YASKAWA yasnac i80m Instruction Manual

Cnc system for machining centers
Table of Contents

Advertisement

2.7
COORDINATE SYSTEM (Cont'd)
*
A"
GS4
ROTATION
COORDINATE
SYSTEM
lj'i4
A
\
O.'.-IR
G54
WORK
COORDINATE
SYSTEM
SHIF
T
Y
C.SC- REFERENCE
COORDINATE
SYSTEM
C54 WORK COORDINATE SYSTEM SHIFT
X
Fig. 2.7.8
Rotation of Work Coordinate
System
NOTE
O
When coordinate
rotation is performed by G54
command,
the G2S G30
command
performs
rotation
at
an
intermediate
positioning point,
but does
not
perform
coordinate rotation
at
the
reference point. G53 does
not
perform
coordinate rotation either.
©
The
plane of
coordinate rotation for
this specification is fixed
to
the G 17
plane.
©
For cancellation after coordinate
rotation
by
the G54
command,
clear the
shift
quantity
of
the work coordinate
system
being
instructed
or that
of
the
G52 command
to
0.
O
Combination with the mirror image, scaling, and coordinate rotation functions
The above
G
codes
must
be arranged in the specified order. Otherwise, alarm 285 occurs. Work
coordinate rotation
(G54)
»
Mirror image
(M95)
)
Scaling
(G51)
)
Coordinate rotation
(G68)
©
Reset
during coordinate rotation by
G54
Intervention
to
coordinate rotation
by resetting
affects
the programmed
trajectory
thereafter.
This is
because of the
following
two
specifications!
1)
By resetting, the current position is fetched
into NC as an NC- instruction
position,
to set
it
again.
2)
In coordinate
rotation, an
axis motion length is
calculated
from the
NC
instruction position
to
the
center
of rotation.
©
For
specifying rotating
coordinate
system,
execute
both X-and Y-axis specifications
as
the
first
move
command of
the
new
coordinate.
When only
one
axis is specified by
©
2).
inadvertant
movement
is
sometimes
performed.
-
90
-

Advertisement

Table of Contents
loading

Table of Contents