Preparation For Automatic Operation - YASKAWA yasnac i80m Instruction Manual

Cnc system for machining centers
Table of Contents

Advertisement

Preparation for automatic operation
To
start
automatic
operation
after
turning on
the
power,
it will be
necessary
to
position the starting point
in accordance with the
program.
It will then
be
necessary to set
the coordinate
system
correctly
to operate
or process
according to
the
program.
A few
examples
will be shown, but refer
to
the
instruction manual of the
machine tool
builder,
for details.
(1)
When there is
no
coordinate
setting
command
(G92)
in the
program
d)
Return the
machine
to
reference
point
with the "Manual reference
point
return" operation in
Par.3.6.1(l).
< 2
)
Set
parameter
with the MDI operation in accordance
with
the
program and
execute
the
following.
3.5.2.5
|
G92 X
......
Y
. . . . . .
Z
:
|
E
REFERENCE
POINT
4
+ .«:
V
COORDINATE
ORIGIN
POINT!
0.
0)
Fifl.
3.5.10
Machining
Coordinate
System
@
The
machining
coordinates are
decided with the reference
point as
the standard.
When the coordinate
system
setting is
|
G92 XO Y0 Z0:
|
corresponding
to
the
program,
0
can
be easily
set
for the coordinate
value
by depressing
the
l
ZERO SET
|
key
following(Dabove. See
Par.3.4.4.7.
EOR
;
N
1
C.
0 0
X
V
Z
\
\
\
Fig. 3.5.11 Example of Programming
-
587
-

Advertisement

Table of Contents
loading

Table of Contents