1-2-2 Unpacking and installation
(1) Installation procedure
Removing the eject spacer
Removing the tapes
Installing the paper feeder (option)
Release the lock of the scanner mirror frame
Release of lift plate stopper
Loading paper
Installing the toner containers
Unlocking the developer waste exit
Replacing operation panel sheet
Installing the original platen or DP (option)
Service Manual
Start
Unpacking
Installing other optional devices
Installing the cassette heater (option)
Connect the power cord
Setting the delivery date
(maintenance item U278)
Output an own-status report
(maintenance item U000)
Exit maintenance mode
Print out the user setting list
Make test copies
Completion of the machine installation.
1-2-2
Installing toner
2LL/2LJ/2LH
Y113350-5