Unpacking And Installation; Installation Procedure - Olivetti d-copia 1800 Service Manual

Hide thumbs Also See for d-copia 1800:
Table of Contents

Advertisement

2KL/2KK
1-2-2

Unpacking and installation

(1) Installation procedure

Start
Load paper.
Unpack.
Connect the power cord.
Remove the tapes.
Install the optional paper feeder.
Installing toner.
Release the scanner pins.
Output an own-status report
(maintenance item U000).
Install the optional original cover or the DP.
Exit maintenance mode.
Install other optional devices.
Make test copies.
Install the toner container.
Attaching the operation label.
Install the waste toner box.
Attaching the cover label.
Completion of the machine installation.
1-2-2
Service Manual
Y110980-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

D-copia 2200

Table of Contents