General Operating Procedures; Switching The Unit On - Sirona Orthophos XG 3D Ceph Service Manual

Table of Contents

Advertisement

4 General operating procedures
4.1 Switching the unit on
60
4

General operating procedures

4.1

Switching the unit on

WARNING
X-rays
Be sure to observe the radiation protection regulations applicable in
your country.
➢ No person may be positioned in the unit when it is switched on.
NOTICE
Damage to the unit
Check the room height before you raise the unit.
➢ If the room height is less than 2.27 m (89 3/8") or 2.30 m (90 1/2")
for installation with the floor stand, you must limit the maximum
travel height [ → 325].
NOTICE
Fluctuations in temperature can cause condensation to form in the unit.
Electrical components are destroyed by short circuits.
➢ Do not switch the unit on until the temperature of the unit has
adapted to the ambient temperature and the condensation has
evaporated.
NOTICE
Waiting time when switching on and off
The unit must not be switched on/off constantly.
Constant switching on and off reduces the service life of individual unit
components and results in increased power consumption.
➢ After switching the unit off, wait for approx. 60 seconds before
switching it on again.
NOTICE
Switching the unit on: XG 3D/3D ready
The surface of the touchscreen is sensitive.
The touchscreen can be damaged or its surface scratched.
➢ Never use pointed objects such as ballpoint pens, pencils, etc. to
operate the touchscreen.
➢ Only use your fingertips to operate the touchscreen.
IMPORTANT
After the unit is switched on, the touchscreen has only limited readability
for several minutes until the background lighting has completed its
warm-up phase.
After the unit is switched off with the main switch, the touchscreen
remains lit for approx. another 3 to 5 seconds.
Sirona Dental Systems GmbH
Service Manual ORTHOPHOS XG 3D / Ceph
63 03 510 D3352
D3352.076.03.11.02 09.2016

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents