Performing Source Role Actions - EMC DL3D 1500 Administrator's Manual

Disk library
Table of Contents

Advertisement

Managing Data Services

Performing source role actions

Managing replication service
158
EMC DL3D 1500 and DL3D 3000 Administrator's Guide
CAUTION
!
If a node fails during a replication job, the replication job must
be restarted.
The NAS share replication process begins. The status of the
current replication displays in the Status area.
To abort namespace replication of a NAS share in progress, select
the share and click the Replicate/Abort button.
To synchronize a NAS share configured for directory/file-based
replication, click Synchronize/Abort. Only NAS shares enabled
for directory/file-based replication can be synchronized.
To abort a synchronization in progress, click Synchronize/Abort.
You can perform the following actions:
Managing replication service. See
on page
158.
Changing the replication state. See
replication" on page
Generating replication reports. See
reports" on page
Viewing replication performance. See
performance" on page
Use the Source Role Actions page to pause or resume the replication
service. Click Actions on the Source Role page to view the Source
Role Actions page. The Source Role Actions page appears.
The replication service controls both replication and failback traffic.
Click Pause to pause both replication and failback traffic for a
replication in process. When you click Pause, the system will
continue to replicate the current block of information in process.
Since the block can be as large as 250 MB, the process of
completing the current block replication can take up to 15
minutes to complete. Once that block has completed replication,
the system will pause and wait to resume.
"Managing replication service"
"Enabling or disabling
159.
"Generating replication
159.
"Viewing replication
160.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dl3d 3000

Table of Contents