LEDs
Figure 1.2: Front Panel
LEDs
Each link is supported by LEDs with the following functionality:
GreenThis LED is illuminated during the OOB sequence before the link is established and
after link is established it indicates traffic on the bus.
Orange
Yellow
Red
Blue
Figure 1.3: LEDs
Status and Configuration Display
The Analyzer front LCD display indicates the configuration and status of operations. For
example, during initialization, the LCD panel displays boot status messages.
Sierra M6‐2 SAS/SATA Protocol Analyzer User Manual
This LED is illuminated as follows:
Speed
Initiator
1.5G
Off
3.0G
On
6.0G
On
This LED is illuminated when a link is established.
This LED illuminates when an error occurs.
This LED is illuminated when a trigger occurs.
Target
Off
Off
On
L eCroy Corporation
19