INSPECTION PROCEDURE
1
Measure resistance between terminal SL of ECM and body ground.
2
Measure resistance of harness and connector between ECM and automatic
transaxle solenoid connector.
)
)
AUTOMATIC TRANSAXLE (U341 El
DIAGNOSTICS
PREPARATION:
Disconnect the connector from ECM.
CHECK:
Measure resistance between terminal
ground.
OK:
Resistance: 11 - 1 5 n at20 ' C {68 'F)
B
Check and replace the ECM {See page IN-30).
PREPARATION:
Disconnect the solenoid connector from the transaxle.
CHECK:
Measure resistance of the harness and connector between ter
minal
of ECM and terminal
SL
OK:
Resistance: 0 n.
Repair or replace the harness or connector.
of ECM and body
SL
of solenoid connector.
SL
01-253