Dl-254
Check shift solenoid valve SL.
3
Replace
the
or repair
and connector between ECM and automatic
transax:le solenoid connector.
PREPARATION:
(a)
(b)
(c)
{d)
CHECK:
Measure resistance between terminal SL of shift solenoid valve
and solenoid body.
OK:
G
solenoid wire, harness
Jack up the vehicle.
Remove the oil pan.
Disconnect the shift solenoid valve SL connector.
Remove the shift solenoid valve SL.
11 - 15 u
Resistance:
at
Replace the shift solenoid valve
20 • c (68 • F)
SL.
I