Field Service Ver. 1.0 Dec. 2008
[8]
[8]
[12]
[16]
[13]
8. Remove two C-rings [8] and remove
the bushing [9].
[9]
4348fs2505c0
9. Shift the Shaft Assy [10] in the orien-
[10]
tation as shown on the left, and
remove the C-ring [11] and the gear
[12].
10. Remove the shaft Assy [10].
[11]
4348fs2506c0
11. Remove C-ring [13], E-ring [14], and
[14]
the bearing [15], and remove the
Pick-up Roller Fixing Plate Assy [16].
[15]
A0RCF2C503DA
2. Periodical check
5