Download Print this page

Subaru 2009 IMPREZA Service Manual page 1854

Hide thumbs Also See for 2009 IMPREZA:

Advertisement

D: ASSEMBLY
NOTE:
• Clean all the parts before assembly.
• Apply NIGTIGHT LYW No. 2 grease or equiva-
lent to each part. <Ref. to CS-4, 5MT GEAR SHIFT
LEVER, COMPONENT, General Description.>
1) Mount the bushing and cushion rubber to the
stay.
(A)
(A) Bushing
(B) Cushion rubber
2) Install the bushing and spacer to boss.
(B)
(A)
(A) Bushing
(B) Spacer
3) Using new self-locking nuts, install the boss to
the joint.
Tightening torque:
12 N·m (1.2 kgf-m, 8.9 ft-lb)
MT Gear Shift Lever
4) Install the snap ring to gear shift lever and install
the bushing.
NOTE:
Apply grease to the bushing.
(B)
CS-00061
5) Apply grease to the bushing and O-ring, and
then install to gear shift lever.
(A)
CS-00238
6) Apply sufficient grease into boss, and then install
the gear shift lever to the stay.
CS-00322
CS-37
(B)
(A)
(A) Spring pin
(B) Bushing
(A)
(B)
(A)
(C)
(A) O-ring
(B) Bushing
(C) Snap ring
CONTROL SYSTEMS
CS-00060
CS-00320
CS-00319

Advertisement

loading