Additional Tasks; Mounting Expansion Card Slot Brackets; Required Tools; General Instructions - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Expansion cards and battery backup units
6.2

Additional tasks

This section provides additional expansion card related information on how to
install slot brackets and SFP+ transceiver modules.
I
For further instructions regarding controller settings, please refer to the
accompanying documentation.
6.2.1

Mounting expansion card slot brackets

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
6.2.1.1

Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
6.2.1.2

General instructions

Ê Place the controller on the mounting tabs on the slot bracket.
Ê Secure the slot bracket to the controller with two M3 x 4.5 mm screws.
Removal is carried out in reverse order.
I
For a more detailed description on how to install a slot bracket on a
controller, please refer to section
86
Upgrade and Maintenance Manual
"Network adapter D3035" on page
87.
CX250 S2

Advertisement

Table of Contents
loading

Table of Contents