Progress - This shows a progress bar and the percent-complete of the print job.
G
Status - The status of the current print job. It could be Printing, Completed, Aborted or Failed.
H
6.1.2.3 Pending Print Jobs
Jobs in this section are waiting for printer assignment, whether automatic or manual. For more information on what keeps a
print job "pending," please see the section
Pending Print Jobs - Tap this button to expand/collapse the Pending Print Jobs list.
A
Module - Indicates where the print job will be assigned, whether automatically or to a specific Printer. Please see the
B
section
Job Queue Assignment
Material - The material that the print job will use, which was sent over with the build file from 3D Sprint
C
Submitted - The date and time the job was submitted to the Print Queue
D
Estimated - The estimated amount of time the print job will take to complete
E
Status - The state of the pending print job. This could be Pending or Needs Manual Assignment.
F
6.1.2.4 Completed Print Jobs
Completed Print Jobs - Tap this button to expand/collapse the Completed Print Jobs list.
A
Module - The Printer where the job was printed.
B
Material - The material that was used to build this job
C
3D Systems, Inc.
Job Queue Assignment
.
for more information.
76
p/n 42-D116, Rev. K
Need help?
Do you have a question about the FIGURE 4 MODULAR and is the answer not in the manual?