Tools Required; Powering Off The Workstation - Sun Microsystems Sun Blade 1000 Service Manual

Hide thumbs Also See for Sun Blade 1000:
Table of Contents

Advertisement

5.4

Tools Required

The following tools are required for servicing Sun Blade 1000 and Sun Blade 2000
workstations:
No. 2 Phillips screwdriver (magnetized tip suggested)
Needle-nose pliers
Grounding wrist strap
CPU module torque-indicator tool, located in the hard drive bracket or behind the
Smart card reader
Digital voltage meter (DVM)
Antistatic mat
5/16-inch nut driver
Place ESD-sensitive components such as the motherboard, circuit cards, hard drives,
and the SEEPROM on an antistatic mat. The following items can be used as an
antistatic mat:
Bag used to wrap a Sun replacement part
Shipping container used to package a Sun replacement part
Access panel, inner side (metal part) of the workstation
Sun ESD mat, part number 250-1088 (available through your Sun sales
representative)
Disposable ESD mat (shipped with replacement parts or optional system features)
5.5

Powering Off the Workstation

Perform the following procedure to power off the workstation. If necessary, view the
ShowMe How video clip located on the Sun Blade 1000 and Sun Blade 2000
Documentation CD-ROM.
Note – If it is necessary to power on the workstation, see Section 9.2, "Powering On
the Workstation" on page 9-4.
Caution – Prior to turning off the workstation power, save, back up, and close any
open files. Notify affected users that you are powering off your workstation.
1. To power off the workstation:
a. If the Solaris OS is running in a windowing environment:
Chapter 5 Preparing for Component Removal and Replacement
5-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunblade 2000

Table of Contents