Preparing For Installation; Table 2-1 Required Tools - Sun Microsystems StorEdge L1000 User Manual

Table of Contents

Advertisement

Preparing for Installation

Before you begin the installation procedures in this chapter:
1. If you have not already done so, perform the procedures found in the Sun
StorEdge L1000 Unpacking Guide.
These procedures explain how to move the library to the installation site, remove
it from its shipping carton, and remove internal packing materials. For your
convenience, unpacking instructions have also been included in the appendixes of
this guide.
2. Check the packing list or the parts list found in the Sun StorEdge L1000 Unpacking
Guide to make sure all necessary parts are available for installation.
Note – The customer must supply all SCSI cabling between the library and host
computer(s).
3. Make sure the tools and equipment listed in
installation.
Required Tools
TABLE 2-1
Quantity
Description
1
Pair of wire cutters
1
Phillips screwdriver
1
Wrench,
11
/
32
4. Protect the library from electrostatic discharge (ESD) by:
a. Connecting the library to a grounded power outlet during installation
b. Avoiding direct contact with static-sensitive components
c. Wearing an antistatic wristband
5. Make sure the installation site meets or exceeds all applicable power requirements
and physical and environmental specifications.
For a comprehensive listing of library specifications and power requirements,
refer to Appendix A.
, open-ended (for rackmount library)
are available for the
TABLE 2-1
Chapter 2
Installing the Library
15

Advertisement

Table of Contents
loading

Table of Contents