PMS PROCEDURE (continued)
O2
PIPELINE
HOSE
SERVICE
ACCESS PANEL
8.12.3 N2O Pipeline Leak
8.12.3.1 Close the nitrous oxide flow control valve.
8.12.3.2 Release the test device push button.
( )
8.12.3.3 After 30 seconds, what is the pressure loss? ___psi (<5)
RETURN TO THIS MANUAL'S TABLE OF CONTENTS
APPENDIX A
PRESSURE TEST ASSEMBLY
4114807 WITH ADAPTERS
SIDE VIEW
O2 CYLINDER REGULATOR
N2O CYLINDER REGULATOR
42
RETURN TO CD-ROM TABLE OF CONTENTS
SV88025
REAR VIEW
FABIUS TIRO