Dräger Medical Fabius Tiro Technical & Service Manual page 257

Anesthesia system
Hide thumbs Also See for Fabius Tiro:
Table of Contents

Advertisement

FABIUS TIRO
PM Certification Procedure for Fabius Tiro Anesthesia System
5. Based on the "EQUIPMENT CONDITION" inspect the machine for any "NAD
RECOMMENDATIONS" that would apply. Use the Fabius Tiro section of the "NAD
RECOMMENDATION GUIDELINES INDEX", P/N S010250. Note all applicable
NAD recommendations on the Executive Summary.
NOTE: If using a carbon form, indicate the Equipment Condition number and to see
reverse side under "RECOMMENDATIONS / GENERAL COMMENTS"
section of the form.
6. Determine the correct certification level of the machine based on the combined
lowest common denominator of "Equipment Conditions" and "Failure Codes". If the
machine is at least conditionally certified, fill out the "PM CERTIFICATION" label.
Check the box(s) on the validation label where appropriate. Write the month and
year, (six months from date of PM Certification) next to "NEXT VISIT DUE:" If
certification level is "D", machine shall not receive a "PM CERTIFICATION" label.
Any machine not receiving a PM Certification label shall receive a "WARNING NOT
CERTIFIED" label. This label shall be placed at a prominent location on the left side
of the machine after all other previous PMS and Vigilance Audit Validation labels
have been removed.
7. In the "CERTIFICATION LEVEL" section of the PM Certification form, record the last
visit certification level, the current certification level and the next visit due month and
year, (six months from date of PM Certification) in the spaces provided.
8. If applicable, remove the previous PM CERTIFICATION VALIDATION label and
attach the new label in a prominent location on the rear of the anesthesia machine.
9. Check the appropriate boxes on the "PM CERTIFICATION NOTICE" label, (part #
S010011). If the machine is not certified, the last box of this notice label shall be
checked. Attach this notice to the flow shield of the anesthesia machine.
10. Have the customer sign each PM Certification form or the Executive Summary, and
review the equipment conditions and recommendations with the customer.
11. Return the top copy to Draeger Medical, Inc. Service Department, keep middle copy
for service organization records, give bottom copy to customer.
RETURN TO THIS MANUAL'S TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTS
APPENDIX A
15
PMS PROCEDURE (continued)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fabius gs

Table of Contents