PMS PROCEDURE (continued)
8.5.6
Change the Preventative Maintenance date to reflect next PM due date.
Press the rotary dial once to return to the main service screen.
8.5.7
Inspect the condition of the ventilator (piston diagram) O-ring. Is the O-ring
in good condition? (Y)
8.5.8
If applicable, install the appropriate PM kit(s) and record in the Parts
Replacement section of the PM form. See
Schedule:" on page 3.
8.6
Calibrations
Fresh Gas Flow:
8.6.1
Scroll to Calibration and press to confirm.
8.6.2
Scroll to Fresh Gas Flow and confirm.
8.6.3
Follow on-screen instructions and perform Fresh Gas Flow calibration.
( )
8.6.4
Verify Stored Zero indicates Pass (Y)
8.6.5
Press the Exit key.
Pressure:
8.6.6
Scroll to Pressure and confirm.
( )
8.6.7
Follow the on-screen instructions and perform the Zero calibration.
Reconnect pressure line and ventilator hose to breathing system.
8.6.8
Press the Exit key, then scroll to O2 and confirm.
O2 Offset:
( )
8.6.9
Follow the on-screen instructions and perform the O2 zero calibration.
Reassemble O2 housing and install the inspiratory dome plug in
inspiratory dome.
PEEP:
NOTE: Before performing the PEEP valve calibration, a valid pressure calibration
must be performed. Otherwise, an 'Inv pres. cal' message will appear.
8.6.10
Press the Exit key; scroll to PEEP and confirm.
( )
8.6.11
Follow the on-screen instructions to calibrate PEEP. Verify PEEP
calibration indicates PASS (Y).
8.6.12
Press Exit, then confirm (x2).
RETURN TO THIS MANUAL'S TABLE OF CONTENTS
RETURN TO CD-ROM TABLE OF CONTENTS
APPENDIX A
"Fabius Tiro Parts Replacement
20
FABIUS TIRO