Table 52: Site Preparation Checklist (continued)
Item or Task
Select the type of rack or cabinet and verify
that it meets the minimum requirements for
the installation of the switch.
Plan rack or cabinet location, ensuring the
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
Plan the cable routing and management.
Acquire cables and connectors:
Determine the number of cables needed
based on your planned configuration.
Ensure that the distance between
hardware components to be connected
allows for cable lengths to be within the
specified maximum limits.

EX8208 Site Guidelines and Requirements

IN THIS SECTION
Environmental Requirements and Specifications for EX Series Switches | 110
General Site Guidelines | 115
Site Electrical Wiring Guidelines | 115
For More Information
"Rack Requirements" on page 118
"Cabinet Requirements" on
page 119
"Clearance Requirements for
Airflow and Hardware
Maintenance for an EX8208
Switch" on page 116
Clearance Requirements for Airflow
and Hardware Maintenance for an
EX8216 Switch
Performed by
Date
109