CAUTION:
first switch at the bottom of the rack.
To install the switch using a mechanical lift (see
1. Ensure that the rack or cabinet is placed in its permanent location and is secured to the building. Ensure
that the installation site allows adequate clearance for both airflow and maintenance. For details, see
"Clearance Requirements for Airflow and Hardware Maintenance for an EX8208 Switch" on page
2. Load the switch onto the lift, making sure it rests securely on the lift platform.
Figure 44: Installing the EX8208 Switch Chassis Using a Mechanical Lift
3. Using the lift, position the switch in front of the rack or cabinet, centering it in front of the adjustable
mounting brackets and/or power cord tray installed in the rack.
If you are installing more than one switch in a rack or cabinet, install the
Figure 44 on page
158):
158
116.