Site Preparation Checklist For An Ex8200 Switch - Juniper EX8208 Hardware Manual

Hide thumbs Also See for EX8208:
Table of Contents

Advertisement

Site Preparation Checklist for an EX8200 Switch

The checklist in
Table 52 on page 108
installing an EX8200 switch.
Table 52: Site Preparation Checklist
Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed
switch tolerances.
Power
Measure distance between external power
sources and switch installation site.
Calculate the power consumption and
requirements.
Rack or Cabinet
summarizes the tasks you need to perform to prepare a site for
For More Information
"Environmental Requirements and
Specifications for EX Series
Switches" on page 110
"AC Power Specifications for
EX8200 Switches" on page 65
"DC Power Specifications for
EX8200 Switches" on page 75
"Power Requirements for EX8208
Switch Components" on page 120
Power Requirements for EX8216
Switch Components
"Calculating Power Requirements
for an EX8208 Switch" on page 121
Calculating Power Requirements for
an EX8216 Switch
"Calculating the Fiber-Optic Cable
Power Budget for EX Series
Devices" on page 132
"Calculating the Fiber-Optic Cable
Power Margin for EX Series
Devices" on page 133
Performed by
Date
108

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ex6210

Table of Contents