CHAPTER 4

Site Preparation

Site Preparation Checklist for EX3200 and EX4200 Switches

Table 25: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Locate sites for connection of system
grounding.
Calculate the power consumption and
requirements.
Hardware Configuration
Choose the number and types of switches you
want to install.
Rack or Cabinet
Copyright © 2010, Juniper Networks, Inc.
Site Preparation Checklist for EX3200 and EX4200 Switches on page 87
General Site Guidelines for EX Series Switches on page 89
Site Electrical Wiring Guidelines for EX Series Switches on page 89
Environmental Requirements and Specifications for EX Series Switches on page 90
The checklist in Table 25 on page 87 summarizes the tasks you need to perform when
preparing a site for EX3200 or EX4200 switch installation.
For More Information
"Environmental Requirements and
Specifications for EX Series Switches"
on page 90
"Power Specifications for EX3200
and EX4200 Switches" on page 101
"EX3200 and EX4200 Switches
Hardware Overview" on page 3
Performed By
Date
87