8.3 Installing Monitoring Devices

This manual does not cover the installation of upstream monitoring devices. For the detailed
installation methods, see iManager NetEco Product Document - (NetEco Version).
If the NetEco is deployed inside the pre-fab. module, it occupies space for server cabinets. It
is recommended that the NetEco be deployed under the ECC800 in the A1 cabinet. The server,
LAN switch, and VCN respectively occupy 2 U, 1 U, and 2 U space.

8.3.1 (Optional) Installing ECC800 Accessories

Prerequisites
Required ECC800 accessories have been obtained.
Preparations
Tools: Phillips screwdriver
Materials: Micro SD card, SIM card, 4G antenna, RF_Z antenna
The SIM card needs to support Global System for Mobile Communications (GSM) and
Wideband Code Division Multiple Access (WCDMA).
Skill requirement: common technician
Procedure
Step 1 (Optional) Remove the ECC800 main control module and install the Micro SD card and SIM
card in the slot on the left side.
1.
2.
3.
Issue 03 (2020-06-09)
Loosen the screws on both sides of the ECC800 main control module.
Pull the handles on both sides of the ECC800 main control module, and remove the main
control module.
Figure 8-7 Removing the ECC800 main control module
Install the Micro SD and SIM card in the corresponding slot of the ECC800 main control
module.