H.
Select Reboot Controller.
The reboot status is temporarily displayed, then the General Status page is dis-
played once the node controller has rebooted.
2.
From the host interface, issue a Reset command for all paths.
All motors on the paths in the transport system are reset.
3.
Issue a Startup command to all paths.
Motion on all paths is enabled, all vehicles on the paths are identified and located, and
the paths become operational.
4.
Move vehicles as required.
•
Use the NCHost TCP Interface Utility to move vehicles individually or create
a Demo Script for repetitive testing (see the NCHost TCP Interface Utility
User Manual, MMI-UM010).
•
Use the host controller application to run the system as required.
All QSHT transport system elements move as directed.
QuickStick HT User Manual
Rockwell Automation Publication MMI-UM007F-EN-P - September 2020
Operation
Transport System Simulation
259
Need help?
Do you have a question about the MagneMotion QuickStick HT and is the answer not in the manual?
Questions and answers