Getting started

Emergency start-up

Electronically controlled gas mixer

1 Adjust the APL valve.
D
2 Set O
switch (C) to the Add. O
2
3 Open the flow control valve (B) and set the
desired O
flow. If necessary, press the
2
O
+ (D) key to quickly fill the breathing bag.
2
4 Monitor the set flow on the O
5 Set the anesthetic gas concentration at the
vaporizer.
6 Manually ventilate the patient.
7 Switch on the device.
8 As soon as the Standby page is displayed,
start the therapy, see page 87.
9 Set the O
switch (C) to Aux. O
2
increased fresh-gas flow.
10 Close the flow control valve (B).
82
A
B
C
position.
2
flowmeter (A).
2
to stop the
2

Mechanically controlled gas mixer

1 Adjust the APL valve.
C
B
A
2 Open the flow control valve (A) and set the
desired O
flow. If required, press the O
2
(C) to fill the breathing bag quickly.
3 Monitor the set flow on the total flow tube (B).
4 Set the anesthetic gas concentration at the
vaporizer.
5 Manually ventilate the patient.
6 Switch on the device.
7 As soon as the Standby page is displayed,
start the therapy, see page 87.