Before First Operation; Establishing The Mains Power Supply - Dräger Perseus A500 Instructions For Use Manual

Anesthesia workstation
Hide thumbs Also See for Perseus A500:
Table of Contents

Advertisement

Assembly and preparation

Before first operation

NOTE
Prior to initial commissioning, the breathing
system and blower module TurboVent 2 must be
reprocessed. Carry out the reprocessing as
described in the reprocessing instructions
supplied with the product.

Establishing the mains power supply

The mains voltage must correspond to the voltage
range indicated by the rating plate on the rear of
the device.
WARNING
Risk due to incorrect mains voltage or
missing protective ground
If the device is connected to a power socket
with incorrect mains voltage or a power
socket without a protective ground, an
electric shock may occur.
Connect the device only to power sockets
with correct mains voltage and a protective
ground.
NOTE
The mains plug must be readily accessible so
that the power supply to Perseus can be
interrupted quickly in the event of a device
failure.
1 Connect the power cable to the device and
secure it.
2 Lay the power cable in the cable conduit on the
right side of the device.
52
3 Pass the power cable around the lower lug (A)
for strain relief.
WARNING
Risk of electrical overload
If the device is connected to additional power
socket strips, this may lead to increased
leakage current. The leakage current may
exceed the permissible values.
– Do not connect the device to additional
power socket strips.
– Do not connect additional power socket
strips to the auxiliary power sockets under
the column covering.
4 Plug the power cable into the mains power
socket on the wall.
5 Check the displays for mains voltage and
battery on the status display.
6 Set the main switch to position I, see page 27.
Instructions for use Perseus A500 SW 2.0n
A

Advertisement

Table of Contents
loading

Table of Contents