Tests
Breathing circuit
Prerequisite:
– Breathing system is complete and locked.
– Breathing system cover is in place.
E
G
1 Hoses (G) and filters, e.g., at the Y-piece (E),
are connected properly.
2 Extendable hoses (F) are extended to the
foreseen application length.
NOTE
Do not change the length of flex hoses after the
test is done.
130
F
3 Remove the water from the hoses.
Valves
Checking the O
flush
2
1 Press the O
+ key and keep it pressed until the
2
pressure exceeds 15 hPa.
Instructions for use Perseus A500 SW 2.0n