first Fabric Interconnect. When the first Fabric Interconnect boots up with a
QDR Fabric Board, move all traffic off of the second Fabric Interconnect and
upgrade that Fabric Interconnect to a QDR Fabric board.
In a single Fabric Interconnect environment, stop all traffic going through
■
the chassis. For example, scheduled traffic, such as backups, can be halted.
You can also turn down vNICs, vHBAs, or Server Profiles. Or, live traffic will
be halted when you power off the Fabric Interconnect.
3.
Remove the InfiniBand cables from your DDR Fabric Board, and disconnect the
Fabric Interconnect from facility power by unplugging the power cables.
4.
Using a screwdriver, loosen the captive screws in the release levers by turning
them counterclockwise (1) as shown in
Board in a Fabric Interconnect F1-4," on page
FIGURE 87
Unlocking the DDR Fabric Board in a Fabric Interconnect F1-4
Upgrade a Fabric Interconnect F1-4 to a QDR Fabric Board
Figure 87, "Unlocking the DDR Fabric
135.
Performing Service Tasks
135
Need help?
Do you have a question about the Fabric Interconnect Series and is the answer not in the manual?
Questions and answers