3 Configuring a New G700 with an S8300 (Primary Controller or Local Survivable Processor):
6.
Watch the progress of the installation.
The Install in Progress screen refreshes every 5 seconds or on demand by clicking the
Refresh button. The installation will take approximately 10 to 20 minutes. When complete, the
S8300 displays the Reboot Server screen.
Figure 28. Reboot Server Window
Click Reboot.
7.
The S8300 displays the Reboot in Progress screen.
Figure 29. Reboot in Progress Screen
!
CAUTION:
The reboot can take up to 20 minutes. However, the system does not automatically tell you
when the reboot is complete. Do not click Continue until you are sure the reboot is
complete, otherwise the installation will fail.