Avaya G700 Installation And Upgrades page 28

Hide thumbs Also See for G700:
Table of Contents

Advertisement

1 Getting Started:
Table 3. Task List to Install a New G700 (with an S8300 or Local Survivable
Processor) Continued
Task
Perform
"Environmental Verification"
on page 44
Perform
"Power Verification" on page
44
Perform
"Grounding Verification" on
page 44
"Unpack and Check the Order" on
page 45
"Prepare the G700 Media Gateway"
on page 47
"Mount the G700 Media Gateway in
the Rack" on page 48
"Insert the Avaya™ S8300 Media
Server (If Necessary for Standalone
Service or LSP)" on page 49
"Insert the Media Modules" on page
51
"Insert an Avaya Expansion Module"
on page 53
"Insert an Avaya X330STK Stacking
Module" on page 54
"Cable Multiple Units" on page 55
"Attach Ground Conductors" on page
58
"Connect AC Power" on page 62
Review
"S8300 LED Indicators" on
page 65
"Install License and Authentication
Files" on page 76
28
Subtasks (If any)
"Affix Mounting Brackets to the G700" on page 47
"Affix Feet on the Table-Top G700" on page 47
"Connect Units within a Single Stack" on page 56
"Link Elements in Multiple Racks" on page 57
Review
"General Grounding Requirements" on page 59
and
"Approved Grounds" on page 60
"Connect the Safety Ground" on page 61
Review
"Power Requirements" on page 62
"Test the AC Outlet" on page 62
"Plug in AC Power" on page 64
"Connect Laptop to Services Port of S8300" on page 76
Installation and Upgrades for the G700 with an S8300/S8700
555-234-100 — Issue 2 — October 2002
Installation Roadmap and Task Lists
or
2 of 6

Advertisement

Table of Contents
loading

Table of Contents