Step 2: Serial Cables - EMC VNX VG2 Setup Manual

Table of Contents

Advertisement

Step 2: Serial cables

Figure 48
Serial cables connect the Control Station to the CallHome modem.
To connect the serial cables:
1.
Figure 48
shows how to connect the preinstalled modem serial cable from the
CS 0 serial port to the first external modem. Then connect the modem to an
analog telephone line supplied by the customer.
Control Station
Serial connection from Control Station to modem
Connect Cables for a Direct-connected VG2
Modem
EMC CONFIDENTIAL
CIP-001139

Step 2: Serial cables

83

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VNX VG2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Vnx vg8

Table of Contents