EMC CONFIDENTIAL
Install Components in Customer's Cabinet
Installing components
Figure 22
54
EMC VNX VG2/VG8 Gateway Configuration Setup Guide
If the VNX VG2/VG8 gateway was installed in an EMC cabinet at the factory, skip
this step.
Using the rails and other hardware included with the network server, install the
components into the customer's cabinet or rack. Before proceeding, verify that the
customer's cabinet has enough space and power available.
Installing,"
provides more information.
The specific mounting instructions depend on the type of cabinet or rack and the type
of rail kit. For 19-inch NEMA cabinets, there are two different types of mounting rails:
If the mounting rails have alignment pins (new-style rails)
◆
Rails and Enclosures (CX3-Series Storage Systems) Field Installation Guide or EMC
Rails and Enclosures (CX4-Series Storage Systems) Field Installation Guide provides
mounting instructions.
If the mounting rails do not have alignment pins and come with clip nuts
◆
(old-style rails), also shown in
Storage Systems) Field Installation Guide or EMC Rails and Enclosures (CX4-Series
Storage Systems) Field Installation Guide provides mounting instructions.
New-Style Rails
Right Rear
Screw (2)
Alignment
Pin
Mounting Rail
Clip Nut
(2)
Old- and new-style 19-inch NEMA rails
WARNING
Pay attention to the warnings in the installation guides, including the warnings
about lifting the enclosures.
Figure
22, the EMC Rails and Enclosures (CX3-Series
Right Rear
Screw (2)
Alignment
Pin (2)
Mounting Rail
Old-Style Rail
Chapter 2, "Before
(Figure
22), the EMC
Clip Nut
(2)
CIP-000233
Need help?
Do you have a question about the VNX VG2 and is the answer not in the manual?