Site Preparation Worksheet - EMC VNX VG2 Setup Manual

Table of Contents

Advertisement

EMC CONFIDENTIAL
Setup Worksheets

Site preparation worksheet

272
EMC VNX VG2/VG8 Gateway Configuration Setup Guide
Before beginning the installation of a VG2/VG8 system, verify that the following site
preparation steps are complete.
provides details:
All components on site
Four power circuits with correct outlets available at cabinet location
Network cables run to cabinet location
Boot array installed and initial configuration complete:
Boot array has at least four unused disks available
Symmetrix boot array (DMX, VMAX, or VMAXe) has been configured with
the required hypervolumes to support the system
Configuration planning complete and all required customer information collected
and recorded, including:
IP addresses, hostnames, netmasks, and default gateway addresses for Control
Station and blades
Usernames and passwords for Fibre Channel (FC) or Fibre Channel over
Ethernet (FCoE) switch and VNX array management programs
CCA complete and approved
CDs for correct EMC NAS software revision available
"Step 2: Confirm site preparation" on page 47

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VNX VG2 and is the answer not in the manual?

This manual is also suitable for:

Vnx vg8

Table of Contents