Phase 3 Setup Tasks - EMC VNX VG2 Setup Manual

Table of Contents

Advertisement

Phase 3 setup tasks

This section lists the required and optional Phase 3 setup tasks to be performed on the
VG2/VG8 system. The optional tasks you perform will vary depending on the
configuration and the options purchased by the customer.
Instructions for each of these tasks are presented in the chapters and appendices that
follow.
1. Add non-boot arrays (optional).
2. Configure storage.
3. Prepare for customer data by creating file systems, shares, exports, netgroups,
and users.
4. Run the setup wizard to configure Control Station, Data Movers, and network
services and interfaces and to create file systems and CIFS servers, and share file
systems.
EMC CONFIDENTIAL
Complete Phase 3 Installation
Introduction
149

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VNX VG2 and is the answer not in the manual?

This manual is also suitable for:

Vnx vg8

Table of Contents