EMC CONFIDENTIAL
Index
Control Station
cabling the modem 72, 83
components 35
front, rear views 39
worksheet 277
Control Stations
configuring 159
connecting to blade 74, 85, 107, 120
connecting to modem 105, 118
installing NAS software 141
private LAN cables 74, 85, 107, 120
serial cables 105, 118
D
Data Movers
See blades
direct-connected 49
cabling 79 to 88, 113 to 124
definition 20
external network cabling 87 to 88
hardware illustration 45
private LAN cabling 85 to 86
serial cables 83
tape backup cabling 84
VNX array 81, 82, 115, 116
documentation
organization 11
related 13
E
E-Lab Interoperability Navigator 13
exports, creating 160
external network
cabling 76 to 77, 87 to 88, 110 to 111, 123 to 124
F
fabric-connected 48
cabling 57 to 77, 89 to 111
CLARiiON array 262, 264, 266, 268
definition 20
external network cabling 76 to 77, 110 to 111, 123 to
124
Fibre Channel cabling 58
Fibre Channel connections 58, 60 to 71, 90
network illustration 46
private LAN cabling 74 to 75
serial cables 72
Symmetrix array 60
tape backup cabling 73, 106, 119
VNX array 62, 64, 66, 68, 70, 103
factory, configuration 24
Fibre Channel
cables 90
connecting arrays 60 to 71
connecting CX3-10 256
connecting CX3-20 or CX3-40 258
connecting CX3-80 260
connections 58, 90
switch connections 91, 92
316
EMC VNX VG2/VG8 Gateway Configuration Setup Guide
worksheet 273
file systems, creating 157
FLARE
committing 193
online update procedure 188
upgrade 187 to 192
I
installation
serial kickstart option 201
serialinstall option 202, 217
software 25
internal management modules, ports to 74, 85
IP addresses
changing primary subnet 176
changing secondary subnet 180
private
changing 173 to 184
primary 174
secondary 175
L
LUNs
creating control LUNs 237 to 249
creating host LUNs 28
host capacities 139
LUNs, creating 155
M
mounting rails 54 to 55
N
NAS software
check system status 143
configure ConnectHome 142
configuring CS 0 139 to 227
failure 229
install and configure 135 to 144
installing on CS 0 139
installing on CS1 141
serial install 202, 217
Navisphere CLI
verify Navisphere Domain Security 133
verify VNX cache settings 132
verify VNX software version 129
Navisphere Domain Security, verifying 132
netgroups, creating 161
network block service 29
P
Phase 1 setup 21
data collection 21
planning 21
Phase 2 setup 21
hand-off worksheet 282
initial configuration 22
physical installation 22
Phase 3
Need help?
Do you have a question about the VNX VG2 and is the answer not in the manual?