Ametek Elgar ReFlex Power Operation Manual page 327

Table of Contents

Advertisement

Active Loads
7. After DC voltage. Enter the voltage using SCPI commands
8. After DC current. Enter the current using SCPI commands
9. Send the calibration command to calculate the gain and offset
10. Send the system error query command to make sure calibration was
11. If there is no error returned at the system error query command then
12. Reset the unit
7-52
CAL<n>:INP:VOLT 2 <value-2>
CAL<n>:INP:CURR 2 <value-2>
CAL<n>:INP:COND:CALC
successful.
SYST:ERR?
save the calibration result with the following command
CAL<n>:UNLOCK "6867"
CAL<n>:STORE
CAL<n>:LOCK
*RST<n>
ReFlex Power™
M380056-01 Rev L

Advertisement

Table of Contents
loading

Table of Contents