Ametek Elgar ReFlex Power Operation Manual page 304

Table of Contents

Advertisement

ReFlex Power™
10. The ReFlex Power™ Controller module should respond with its
11. Verify communications with the ReFlex Power™ active load module by
S
TANDALONE
1. Connect the input for standalone operation per the section, Standalone
2. Connect appropriate instrumentation for measuring the input voltage and
3. Perform the power-on verification test per the section, Power-On Check.
4. Turn on the isolation and remote sense relays, turn on the active devices,
5. Measure the input current and voltage with the external instruments.
6. Ensure that the actual values of the input parameters are within
7. Query the values of the output parameters with the following commands:
8. Ensure that the readback values of the output parameters are within
9. Turn off the output with the following command:
M380056-01 Rev L
identification string.
issuing an SCPI *IDN[n]?, where "n" is a channel number that
corresponds to the slot of the ReFlex Power™ Mainframe where the
module is located, counting left to right, 1 through 12.
The Active Load module should respond with its identification string. The
default settings of the module will not be affected.
C
O
ONFIGURATION
PERATION
Configuration.
current, as well as a load.
and program full-scale current with the following commands:
*RST[n]
OUTP[n]:ISOL 1
OUTP[n]:SENS 1
INP[n]:STAT 1
SOUR[n]:CURR <fval>
specifications of the programmed values.
MEAS[n]:VOLT?
MEAS[n]:CURR?
specifications of the actual values.
*RST[n]
C
HECK
Active Loads
7-29

Advertisement

Table of Contents
loading

Table of Contents