Danfoss ADAP-KOOL Drive Programming Manual page 62

Hide thumbs Also See for ADAP-KOOL Drive:
Table of Contents

Advertisement

3 Parameter Description
3-52 Ramp 2 Ramp Down Time
Range:
20.00 s*
[1.00 - 3600.00 s]
3
3.5.5 3-8* Other Ramps
Configure parameters for special ramps e.g. Jog.
3-80 Jog Ramp Time
Range:
20.00 s*
[1.00 - 3600.00 s]
3-82 Starting Ramp Up Time
Range:
20.00 s*
[0.01 - 3600.00 s]
3.5.6 3-9* Digital Pot.Meter
The digital potentiometer function allows the user to increase or decrease the actual reference by adjusting the set-up of the digital inputs using the
functions INCREASE, DECREASE or CLEAR. To activate the function, at least one digital input must be set up to INCREASE or DECREASE.
3-90 Step Size
Range:
0.10 %*
[0.01 - 200.00 %]
62
Function:
Enter the ramp-down time, i.e. the deceleration time from par.1-25
Choose a ramp-down time such that no over-voltage arises in the inverter due to regenerative
operation of the motor, and such that the generated current does not exceed the current limit set
Current Limit
in par.4-18
. See ramp-up time in par.3-51
tdec
nnorm par
×
par
.3 − 52 =
ref rpm
Function:
Enter the jog ramp time, i.e. the acceleration/deceleration time between 0 RPM and the rated motor
speed (n
) (set in par.1-25
Motor Nominal Speed
M,N
quired for the given jog ramp time does not exceed the current limit in par.4-18
jog ramp time starts upon activation of a jog signal via the control panel, a selected digital input,
or the serial communication port.
tjog
×
nnorm par
par
. 3 − 80 =
jog speed par
. 3 − 19
Function:
The ramp-up time is the acceleration time from 0 rpm to the nominal motor speed set in par. 1-25.
when High Starting Torque is active.
Function:
Enter the increment size required for INCREASE/DECREASE, as a percentage of the synchronous
motor speed, n
. If INCREASE/ DECREASE is activated the resulting reference will be increased /
s
decreased by the amount set in this parameter.
MG.11.N1.02 - VLT
®
is a registered Danfoss trademark
®
ADAP-KOOL
Drive Programming Guide
Motor Nominal Speed
Ramp 2 Ramp Up Time
. 1 − 25
s
). Ensure that the resultant output current re-
. 1 − 25
s
to 0 RPM.
.
Current Limit
. The

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents