Parameters for configuring the Basic Pack Controller for sequence control of multiple compressors. For a more application oriented description and wiring
examples, see section
Application Examples, Basic Pack Controller
3
To configure the Pack Controller to the actual system and the desired control strategy, it is recommended to follow the below sequence, starting with
System Settings
, par. 25-0*, and next
Zone Settings
Parameters in
final adjustment to be done at the commissioning of the plant.
In most cases, only 25-0* and 25-2* will need adjustment.
NB!
The Pack Controller is supposed to operate in closed loop controlled by the built-in PI controller (Closed Loop selected in
Mode
, par.1-00). If
speed compressor will still be controlled by the frequency converter, now as an open loop configuration:
200
Alternation Settings
, par. 25-5*. These parameters can normally be set in advance.
Staging Functions
, 25-2*,
, 25-3* and
Open Loop
Closed Loop
is selected in
MG.11.N1.02 - VLT
.
Staging settings
, 25-4*, will often be dependent on the dynamic of the system and
, par.1-00, all fixed speed compressors will be destaged, but the variable