Suzuki Wagon R Manual page 3849

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

6A4-22 ENGINE MECHANICAL (Z10XEP AND Z12XEP ENGINES)
Installation
1) Install oil pan baffle plate, if removed.
Tightening torque
Oil pan baffle plate bolt (a): 8 N·m (0.8 kg-m, 6.0 lb-ft)
2) Install oil pump strainer and new sealing, if removed.
Tightening torque
Oil pump strainer bolt: 8 N·m (0.8 kg-m, 6.0 lb-ft)
3) Clean mating surface of oil pan and timing chain cover.
4) Install oil pan with new gasket as follows.
a) Attach oil pan with new gasket to lower crankcase.
b) Tighten all oil pan bolt by hand.
c) Tighten oil pan bolts for lower crankcase as specified
torque.
d) Tighten oil pan bolts for transaxle as specified torque.
Tightening torque
Oil pan bolt for lower crankcase:
Tighten 10 N·m (1.0 kg-m, 7.5 lb-ft) by the specified proce-
dure.
Oil pan bolt for transaxle:
Tighten 52 N·m (5.2 kg-m, 38.0 lb-ft) by the specified pro-
cedure.
5) Install exhaust pipe referring to "Exhaust Pipe Removal and
Installation" in Section 6K4.
6) Refill engine with engine oil referring to "Engine Oil and Oil
Filter Replacement" in Section 0B.
7) Check to make sure that there is no engine oil leakage and
exhaust gas leakage at each connection.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents