Suzuki Wagon R Manual page 3935

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

6E4-6 ENGINE AND EMISSION CONTROL SYSTEM (Z10XEP AND Z12XEP ENGINES)
3
2
On-Vehicle Service
Throttle Body Removal and Installation
Removal
1) Disconnect negative cable at battery.
2) Drain coolant referring to "Cooling System Draining" in Sec-
tion 6B4.
3) Remove air intake hose.
4) Disconnect connector (2) from throttle body.
5) Disconnect preheater hoses (3) from throttle body.
6) Remove throttle body (1) from intake manifold.
2
1
Installation
1) Clean mating surface and install new throttle body gasket to
intake manifold.
2) Install throttle body to intake manifold. Tighten throttle body
bolts (1) to specified torque.
Tightening torque
Throttle body bolt (a): 7 N·m (0.7 kg-m, 5.0 lb-ft)
3) Connect preheater hoses (2) to throttle body.
4) Connect connector (3) to throttle body.
5) Install air intake hose.
6) Refill coolant referring to "Cooling System Refill" in Section
6B4.
3
7) Connect negative cable to battery.
If throttle body replaced with new one, turn ignition switch to
1,(a)
ON position and wait for 30 minutes to retrain throttle valve
position.
NOTE:
Do not start the engine whilst waiting, as the training pro-
cess will be interrupted.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents