Suzuki Wagon R Manual page 3918

Hide thumbs Also See for Wagon R:
Table of Contents

Advertisement

ENGINE COOLING (Z10XEP AND Z12XEP ENGINES) 6B4-11
Installation
1) Clean sealing surfaces for thermostat and water pump.
2) Install thermostat (2) with new seal rings.
Tightening torque
Thermostat bolt
(a): 8 N·m (0.8 kg-m, 6.0 lb-ft)
3) Install upper coolant pipe (1).
Tightening torque
Coolant pipe bolt
(b): 20 N·m (2.0 kg-m, 14.5 lb-ft)
Thermostat housing bolt
(c): 12 N·m (1.2 kg-m, 9.0 lb-ft)
4) Install intake pipe.
5) Refill coolant referring to "Cooling System Refill" in this sec-
tion.
Radiator Removal and Installation
Removal
1) Disconnect negative cable at battery.
2) Drain cooling system referring to "Cooling System Draining"
in section.
3) Remove upper radiator hose (1).
4) Disconnect fan motor wiring harness coupler (3).
5) Disconnect coolant hose (2) from radiator.
6) Remove front bumper referring to "Front bumper and Rear
bumper" in Section 9.

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents