Subaru Legacy 2004 Service Manual page 425

Hide thumbs Also See for Legacy 2004:
Table of Contents

Advertisement

10) Remove the rectifier as follows.
(1) Remove the bolt which secures the rectifier.
(2) Remove the cover of terminal B.
(3) Remove the nut of terminal B, and then re-
move the rectifier.
D: ASSEMBLY
Assemble in the reverse order of disassembly.
1) Pulling up brush
Before assembling, press the brush down into
brush holder, and then fix them in that position by
passing a [1 mm (0.08 in) dia. 40 to 50 mm (1.6 to
2.0 in) long] wire through the hole as shown in the
figure.
Generator
CAUTION:
Be sure to remove the wire after reassembly.
SC-00089
2) Install the ball bearing.
(1) Set the ball bearing on the front cover, and
then securely install an appropriate tool (such as
a fit socket wrench) to the bearing outer race.
(2) Press the ball bearing into the specified po-
sition using a press.
(3) Install the bearing retainer.
3) Press the bearing (rear side) into the rotor shaft
using a press to install.
SC-00090
4) Heat the bearing box in rear cover [50 to 60"C
(122 to 140"F)], and then press the rear bearing
into rear cover.
CAUTION:
Grease should not be applied to rear bearing.
Remove the oil completely if it is found on bear-
ing box.
5) After reassembly, turn the pulley by hand to
check that rotor turns smoothly.
SC-00091
SC(H4SO 2.0)-17
STARTING/CHARGING SYSTEMS
(A)
(A) Wire
SC-00092

Advertisement

Table of Contents
loading

Table of Contents