Visual Inspection - GE HEALTHCARE CARESCAPE Monitor B650 Technical Manual

Hide thumbs Also See for CARESCAPE Monitor B650:
Table of Contents

Advertisement

CARESCAPE Monitor B650
Performed service activity
After detaching or replacing:
-
Front Unit Assembly FRU
-
User Interface Board FRU
-
Trim Knob and Trim Knob Encoder
FRU
-
Keypad FRU
After detaching or replacing:
-
LCD Display Unit FRU
After detaching or replacing:
-
Rear Unit Assembly FRU
-
AC/DC Power Supply Unit FRU
-
DC/DC board FRU
-
CPU timekeeper battery FRU
-
Hinge Flex Board
After replacing:
-
uDOM
After detaching or replacing:
-
Base Unit
-
Mid-Frame Assembly FRU
-
CPU board
Planned maintenance schedule
Service personnel shall perform the following checkout procedure every 12 months after
installation:
1.
Visual inspection (section 10.1)
2.
Electrical safety tests (section 10.2)
3.
Functional check (section 10.3, all steps)
4.
Battery maintenance (section •)
Replace the CPU timekeeper battery every 5 years, or whenever the Service Monitor Error
Code 0xHOST1100 message is shown.

10.1 Visual inspection

Follow the procedure in section
130
2081903-001
Required checkout procedure
Visual
Electrical
inspections
safety test
(section 10.1)
(section 10.2)
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
8.1. Visual
inspection.
Functional check
(section 10.3)
-
10.3.1 Start-up
-
10.3.5 Keypad and remote
-
10.3.1 Start-up
-
10.3.2. Display
-
10.3.3 PSM / PDM
identification
-
All steps, except 10.3.14
Synchronization connector
test.
-
All steps, except 10.3.14
Synchronization connector
test.
-
All functional check steps.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents