Display - GE HEALTHCARE CARESCAPE Monitor B650 Technical Manual

Hide thumbs Also See for CARESCAPE Monitor B650:
Table of Contents

Advertisement

monitor battery and disconnecting the power cord from the wall outlet for a moment before
turning the monitor on.
Verify that the patient monitor starts up normally:
NOTE: Refer to section
battery replacement, if you receive a Condition monitor battery or a Battery Failure message.
NOTE: Before taking the patient monitor into use for the first time, the battery should be fully
charged. Keep the monitor connected to the mains until the battery is fully charged.

8.3.2 Display

Picture quality
Perform this test both for the integrated main display and for the optional secondary display.
1.
Verify that all text is readable and all images are clear.
2.
Verify that the brightness is good. Adjust if necessary.
Touchscreen control
Perform this test only if the integrated main display or the optional secondary display is a
touchscreen.
1.
Verify the operation and the calibration of a touchscreen by touching a corner of an
active parameter window. Verify that the selected menu is opened.
2.
Select
8.3.3 Device Information
1.
Log in to Webmin.
2.
Select Information > Device Information.
3.
Verify that the device information is correct:
4.
Stay connected to Webmin.
8.3.4 Configuration Information
1.
Select Information > Configuration Information.
2.
Verify that the patient monitor is correctly configured:
The yellow, red and blue alarm lights are lit momentarily.
The speaker gives an audible beep.
The normal monitoring screen appears and there are no error messages on the
screen.
11. Troubleshooting
to close any open menu and return to the main display.
The connected parameter modules are identified.
The connected CARESCAPE Network ID interfaces are identified.
The connected USB input devices are identified.
The host Information is correct.
The active software package is correct.
The correct host licenses are enabled.
The correct PDM licenses are enabled.
Patient ID prefix is correctly configured.
Unit and Bed name are correctly configured.
to see the procedure for battery conditioning and
Installation checkout
111
2081903-001

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents