Dimensioned Drawings, Drilling Dimensions For The Pm260 Power Module; Dimensioned Drawings, Drilling Dimensions For The Pm340 Power Module - Siemens sinamics G120 Operating Instructions Manual

Low voltage inverters chassis devices with cu250s-2 control units and encoder evaluation
Hide thumbs Also See for sinamics G120:
Table of Contents

Advertisement

Installing
4.4 Installing Power Modules
4.4.7

Dimensioned drawings, drilling dimensions for the PM260 Power Module

The dimensioned drawings and drilling dimensions for the PM260 Power Module are
available in the Internet:
Installation Guide for the PM260 Power Module
(https://support.industry.siemens.com/cs/ww/en/view/79109730)
4.4.8

Dimensioned drawings, drilling dimensions for the PM340 Power Module

The following dimensioned drawings and drilling patterns are not to scale.
Image 4-1
The Power Modules can be mounted and operated side-by-side. For tolerance reasons, we
recommend a lateral clearance of approx. 1 mm.
Cooling clearances and fastening
● Top cooling clearance: 100 mm
● Bottom cooling clearance:
● Front cooling clearance:
● For fastening:
Depth with Control Unit and Operator Panel
• with Control Unit:
• With Control Unit and blanking cover / BOP-2:
• With Control Unit and IOP:
70
Mounting dimensions and drilling dimensions (mm)
100 mm
65 mm
2 x M4 / 2.5 Nm
Operating Instructions, 01/2016, FW V4.7 SP6, A5E31759476B AE
207 mm
218 mm
229 mm
Converter with CU250S-2 Control Unit

Advertisement

Table of Contents
loading

Table of Contents