Siemens sinamics G120 Operating Instructions Manual page 521

Low voltage inverters chassis devices with cu250s-2 control units and encoder evaluation
Hide thumbs Also See for sinamics G120:
Table of Contents

Advertisement

Terminal strip
Factory setting, 89
Overview, 87
Test signals, 335
Three-wire control, 164, 164
Time slice, 311
TN line system, 71
Torque accuracy, 125, 125, 131, 131
Trace function, 492
TT line system, 71
Two-wire control, 164, 164
Type plate
Control Unit, 27
Power Module, 27
U
UL, 460
Unit system, 267
Unwinders, 280
Update
Firmware, 399
Upgrading the firmware, 394
Upload, 351, 361, 365
USB interface, 121
Use for the intended purpose, 27
User interfaces, 85
V
V/f characteristic, 225
V/f control, 485
VDC min controller, 292
Vector control, 233, 236, 248, 485
Version
Control Unit, 27
Firmware, 507
Hardware, 507
Power Module, 27
Safety function, 507
Vertical conveyors, 278
Voltage boost, 225, 226, 230, 231, 485
Voltage input, 157
W
Winders, 280
Wire breakage, 335
Wire-break monitoring, 158, 254, 255
Write protection, 368, 368
Converter with CU250S-2 Control Unit
Operating Instructions, 01/2016, FW V4.7 SP6, A5E31759476B AE
X
XOR, 322
Z
ZSW1 (status word 1), 177, 197, 200
ZSW3 (status word 3), 180
Index
521

Advertisement

Table of Contents
loading

Table of Contents