Mitsubishi Stealth 1994 Import Service Manual page 834

Table of Contents

Advertisement

POWER CYLINDER
REMOVAL AND INSTALLATION
Pre-removal Operation
Cleaning of Pipings with Steam
l
Draining of Power Steering Fluid
l
(Refer to GROUP 19A-Service Adjustment
Procedures.)
Removal of Main Muffler Assembly
l
(Refer to GROUP 11 - Exhaust Pipe and Muffler.)
78 Nm
80 - 94 ft.lbs.
56 ft.lbs.
Removal steps
1. Rear shock absorber lower mounting bolt
2. Crossmember bracket
3. Crossmember mounting nut
(on differential side)
4. Pressure tube (RL)
5. O-ring
6. Pressure tube (RR)
7. O-ring
8. Oil line clamp bolt
9. Tie rod end nut
l
+ 11, Power cylinder
Post-installation Operation
Installation of Main Muffler Assembly
l
(Refer to GROUP 11 -Exhaust Pipe and Muffler.)
Refilling and Bleeding of Power Steering System
l
(Refer to GROUP 19A-Service Adjustment
Procedures.)
Bleeding of 4WS System
l
(Refer to P.l9B-4.)
Checking of 4WS System for Operation
l
(Refer to P.l9B-5.)
Checking of Wheel Alignment
l
(Refer to GROUP 17 -Service Adjustment
Procedures.)
2Nm
0 ftlbs.
78 Nm
56 ft.lbs.
80 - 94 ft.lbs.
72 ftlbs.
80 - 94 ft.lbs.
Fluid line flared nut
15 Nm
11 ft.lbs.

Advertisement

Table of Contents
loading

Table of Contents