Mitsubishi Stealth 1994 Import Service Manual page 590

Table of Contents

Advertisement

MULTIPORT FUEL INJECTION -
HARNESS INSPECTION
2
connector
On-Vehicle Inspection of MFI Components
Measure the power supply voltage.
Connector: Disconnected
l
Ignition switch: ON
l
Voltage (V)
Check for an open-circuit, or a short-
circuit to ground between the eva-
porative emission purge solenoid and
the engine control module.
Engine control module connector:
l
Disconnected
Evaporative emission purge sole-
l
noid connector: Disconnected
ACTUATOR INSPECTION
Refer to GROUP 25 - Evaporative Emission Control System.
harness.
Repair the

Advertisement

Table of Contents
loading

Table of Contents