Mitsubishi Stealth 1994 Import Service Manual page 421

Table of Contents

Advertisement

INTAKE AND EXHAUST
INSPECTION
TURBOCHARGER
to make sure it operates freely.
(2) Inspect the oil passage in the cartridge for signs of deposits
or blockage.
(3) Clean the inlet section of the compressor cover with a rag.
Inspect it for signs of contact with the compressor turbine.
If worn, replace it.
SERVICE POINTS OF REASSEMBLY
7. INSTALLATION OF O-RING
Coat the inner surface of a new O-ring with a thin film of
engine oil, and set it in the groove of the cartridge
assembly.
Caution
Be careful not to damage the O-ring while installing it
as oil leakage could result.
6. 'INSTALLATION OF CARTRIDGE ASSEMBLY
(1) Coat the outer circumference of the cartridge assembly
(2) Install the cartridge assembly on the compressor cover
5. INSTALLATION OF SNAP RING
Place the cartridge assembly with the compressor cover
faced down and install the snap ring.
Caution
Install the snap ring with the tapered side of its outside
diameter up.
4. INSTALLATION OF TURBINE HOUSING
Install the compressor cover and cartridge assembly on the
turbine housing with the dowel pin in alignment.
Caution
1. Be careful not to damage the blades of the turbine
2. Be careful to install the turbine housing in the
by aligning the dowel pin.
Caution
When installing the cartridge assembly on the
compressor cover, be careful not to damage the
compressor wheel blades.
wheel.
correct direction.

Advertisement

Table of Contents
loading

Table of Contents